Concept & Feasibility
A detailed site survey followed by a realistic assessment of what the existing shell can support: structurally, spatially, and in services. This is where problems are cheap to solve.
From the first site visit to handing back the keys, every phase ends with a tangible output: a document, an approval, or a signed-off milestone. Clear progress, no ambiguity.
Durations below are typical planning ranges for a UAE project. The single biggest variable is how early the approvals track starts, which is why we open it in parallel with design rather than after it.
Each phase ends with something you can hold: a document, an approval, or a signed-off stage.
A detailed site survey followed by a realistic assessment of what the existing shell can support: structurally, spatially, and in services. This is where problems are cheap to solve.
Architectural, MEP and joinery developed together, not in sequence. All interfaces coordinated upfront to ensure the design is buildable, compliant, and ready for authority submission.
Submissions launched in parallel with design development, not after. This approach protects the programme and removes weeks of avoidable downtime.
Trades sequenced so no team is waiting on another. Weekly progress reporting with photos keeps stakeholders informed and the programme fully transparent.
Systems commissioned, snags resolved, documentation complete. A handover that is genuinely ready to open, not a phase that drifts.
Which of these apply depends on your sector, emirate and zone. We confirm the exact route for your project at feasibility stage, before anything is designed around an assumption.
Concept and detailed design approvals, covering shopfront lines, ceiling voids, working hours and materials.
Approval depends on the location of the project: the emirate, municipality, or other development authority or free-zone regulator.
F&B only. Flow separation, wash-up sequence, cold-room siting and finish specs.
Fire detection, fighting and suppression systems, specialized systems, escape routing and material ratings.
We check the requirements of the project and obtain the utilities approval accordingly.
Separate submission, inspection and certification from Civil Defence or the Department of Energy before any cooking line is commissioned.
Signage permits from the Land Department, subject to landlord and street requirements.
Final inspections handled with the authorities, landlords, client and maintenance team before you are cleared.